Quickstart – Get Up and Running
Set up your first project on Origin in minutes. Follow this quickstart guide to connect your repository, configure your environment, and start running AI-assisted development tasks.
This guide walks you through creating your first project in Origin, provisioning its workspace, and starting work inside a trial with agent-generated suggestions.
Origin is built around repository-backed projects. Every project is a deployed workspace created from a Git repository (or template), provisioned with compute, indexed for context, and prepared for agent-driven development.
Before working with agents, you must create and deploy a project.
Sign In and Access the Projects Page
After signing in with GitHub, you land on the Projects page.
If this is your first time, the workspace will be empty and display an option to Import New Project.
From here, you can:
- Import an existing GitHub repository
- Clone a starter template
Projects are organized in Grid or List view, and can be filtered or sorted by repo owner.
Create a New Project
You will choose one of two starting points:
Option A: Import from GitHub
If your GitHub account is connected, Origin will display repositories you have access to.
You can:
- Search by repository name
- Select a repository
- Choose a branch (default is usually
main)
Once selected, Origin creates a project-scoped clone inside the workspace.
The original GitHub repository is never modified directly unless you explicitly create a pull request or push changes.
Example Use Cases
- Import a production backend API to add automated tests
- Import a frontend application to implement new UI features
- Import a monorepo to analyze architecture and refactor services
If you do not have GitHub access to a repository, you cannot open it in Origin.
Option B: Use a Template
Templates provide preconfigured starter projects.
Examples include:
- A Next.js starter
- A SaaS boilerplate
- Demo applications
Selecting a template creates a new repository instance inside Origin. After deployment, it behaves like a normal imported project.
Use templates when:
- Prototyping a new product
- Testing Origin capabilities
- Creating internal demos
- Evaluating agent workflows
Configure the Workspace
After selecting your repository or template, you configure the Workspace.
Configure details like:
- Repo name
- Location (the owner/org of the repository)
- Visibility (private or public)
- Environment Variables (optional)
All workspaces are TDX encrypted by default ensuring hardware-backed confidentiality.
Environment Variables (Optional During Setup)
Before deployment, you can expand Environment Variables and add runtime configuration.
Examples:
DATABASE_URLJWT_SECRETOPENAI_API_KEYREDIS_URL
These values are injected into the sandbox at runtime.
They are not committed to GitHub and remain scoped to the project workspace.
You can also manage secrets later from the Secrets tab if needed.
Deploy the Project
After configuration, click Deploy.
Origin provisions the environment in real time:
- Creating project container
- Provisioning workspace
- Cloning repository
- Installing dependencies
- Indexing the codebase
- Preparing agent runtime
You can monitor progress directly in the UI.
Once deployment completes:
- The repository is cloned
- The workspace is running
- The codebase is indexed
- Agents are ready
Open the Project
Click the project card to enter the project workspace.
From here, you can:
- Manage tasks
- Discovery with AI
- Set milestones
- Create cycles
- Add tasks
- Track open PRs
- Create/continue Trials
Discovery with AI scans the indexed repository and proposes actionable tasks, such as missing tests, refactoring opportunities, architectural improvements, or potential issues. This is useful when onboarding a new codebase or identifying areas for improvement.
If the workspace is stopped, you can manually restart it from the project view.
Start Your First Trial
Trials are the core working units in Origin.
When you create or select a task, Origin creates a trial. You can also manually start a new trial.
Inside a trial:
- The agent has access to the indexed repository
- All execution runs inside the provisioned workspace
- Changes are isolated to a session branch
- You interact with the agent via chat
To select a specific file, type @ inside the chat input.
Example Instructions
- “Add JWT authentication to the API.”
- “Create integration tests for the payment flow.”
- “Explain how the caching layer works.”
- “Refactor this component for readability.”
After indexing, Origin may suggest tasks such as:
- “Add missing E2E tests.”
- “Refactor duplicated logic.”
- “Fix potential type safety issues.”
Understand the Workspace Panels
Inside a trial, the side panel includes:
- Explorer – Browse repository files
- Task – View task details and metadata
- Context – Manage indexed documents and references
- Todos – Track structured execution steps
- Changes – Review file modifications
- Terminal – Run commands inside the workspace
These panels update dynamically as work progresses.
Review and Manage Changes
All file modifications appear in Changes.
Before creating a pull request, you can:
- Review diffs
- Inspect added and removed lines
- Validate agent edits
- Run tests inside the workspace
Changes remain isolated to the trial branch until you explicitly promote them.
Nothing is pushed to GitHub automatically.
Using the Desktop App
Everything in this guide also applies to Origin CDE for macOS, the native desktop app for Apple Silicon Macs. The projects, tasks, agents, and workspaces are identical, the desktop app is a native alternative to the browser.
To get started in the desktop app, connect your GitHub account first, then import a repository. From that point the flow is the same as above, deploy, open the project, start a trial.
See Origin CDE - Desktop App for download instructions, an interface walkthrough, workspace provisioning details, and how to fetch TDX attestation records directly from the app.
Example End-to-End Workflow
- Import a backend API repository
- Add
DATABASE_URLandJWT_SECRET - Deploy
- Create a task and start a trial
- Ask: “Add role-based access control.”
- Review generated changes
- Run tests in Terminal
- Create a pull request
All steps occur inside Origin’s managed sandbox environment.
What Happens Behind the Scenes
When you deploy a project:
- A workspace (TDX confidential environment) is provisioned
- The repository is cloned
- The codebase is indexed for context
- A working branch is prepared
- Agent execution is initialized
No changes are pushed to GitHub unless you explicitly create a pull request or merge changes.
Next Steps
You are now ready to:
- Create multiple trials for parallel development
- Use structured Workflows for QA, documentation, or security tasks
- Configure Secrets for authenticated execution
- Collaborate within team spaces
Origin provides a unified development environment where repository context, secure execution, and agent reasoning operate together inside a controlled and verifiable workflow.
Introduction to Origin
Get started with Origin, the AI-native development platform. Learn what Origin is, how it works, and how to begin building with structured, repository-backed AI development workflows.
Origin CDE - Desktop App
Download and use Origin CDE as a native desktop application on macOS. The same confidential development environment, projects, tasks, agents, and worktrees, running natively on your machine.